工程业绩

    大众汽车变速器(天津)公司设备安装及工艺管线安装工程

    发布于2018-04-18 13:27 点击:

    ◆大众汽车变速器(天津)公司设备安装及工艺管线安装工程

    本项目为大众公司天津首开项目,该项目建筑面积16万平米,三诺公司承接设备的运输、安装、二次管线安装、设备强弱电系统的安装;截至目前设备安装累计吨位为1.65万吨,项目还在继续进行中。

    ◆The equipment installation and process pipeline installation works about Volkswagen automatic transmission Tianjin Corporation。

    This project is the first project of Volkswagen automatic transmission Tianjin Corporation,the project construction area of 160 thousand square meters.Sannuo undertake the transportation and installation of equipment , installation of the second pipeline,installation of equipment for power system.Up to now, the cumulative tonnage of equipment installation is 16,500 tons, and the project is still in progress now.